1.工作前必須穿戴好防護用品,持證上崗。工作時不得少于兩人。
2.噴砂工作前,檢查管道內壁噴砂系統工作是否正常。在噴砂過程中,雙層噴砂罐通過PLC設定,使料位儀、壓差計、進氣氣控閥、排氣氣控閥有效聯動控制。可實現連續噴砂的功能。
3.噴砂工作前,檢查磨料旋風分離機工作是否正常。在噴砂過程中將回收室的磨料和灰塵中有效的將其磨料分離出來到儲料斗中。
4.噴砂工作前檢查回收除塵系統工作是否正常。在噴砂過程中脈沖反沖裝置有效進行清除濾芯外壁集結的灰塵,在清理的時候無灰塵外溢。
5.每班噴砂工作結束。人工清理前、后兩端的艙體回收室,將灑落的磨料清理干凈。
6.定期檢查系統的各連接口是否良好,確保液壓管路系統壓縮空氣管路、回砂管路的密封性能;若有漏氣現象需及時維護(該項工作,每月進行一次)。
7.定期清除除塵箱集灰斗內的粉塵(該項工作每周進行一次)。
8.定期檢查噴砂機噴槍、砂管等易損件的性能情況,若有損壞需及時更換(該項工作每周進行一次)。
9.定期檢查除塵器濾芯性能,若濾芯老化,應及時更換(該項工作每半年進行一次)。
10.電氣控制柜應與作業區隔離,經常性打開柜門用壓縮空氣吹洗內部的粉塵(該項工作每月進行一次)。
11.定期檢查鏈條、鏈輪、電機等系統的潤滑,及時添加潤滑油(該項工作每月進行一次)。
12.噴砂機工作時,禁止無關人員靠近。清掃和調整運轉部位時,應停機進行。
13.不準用壓縮空氣吹身上灰塵。
14.發生人身、設備事故,應保持現場,并報告有關部門。
中譯英:
1 Before work must wear protective supplies, hold card mount guard. Work shall not be less than two.
2 Sandblasting before work, inspection of pipeline inner wall sandblasting system whether normal. In the sandblasting process, double layer sand tank through the PLC set, so that the material level meter, pressure meter, the intake air control valve, exhaust gas control valve effective linkage control. Can realize continuous sand blasting function.
3 Sandblasting before work, check whether the normal work of the abrasive cyclone separator. In the process of recovering chamber blasting abrasive and dust effectively separated into the abrasive in the storage hopper.
4 Sand blast work before recovery dedusting system whether normal. In the sandblasting process pulse back flushing device for effective removal of the outer wall of the filter core assembly of dust, in cleaning up no dust overflow.
5 Each class sandblast working end. Manual cleaning, before the rear ends of the cabin body recovery room, will be scattered abrasive to clean up.
6 Regular inspection system of each interface is good, to ensure that the hydraulic pipeline system compressed air pipeline, back to the sand pipe sealing performance; if leakage phenomenon should timely maintenance(the work, on a monthly basis).
7 Periodic removal of dust collection box set the dust in the dust(the work once a week).
8 Regular inspection of sandblasting machine gun, mortar pipe and other vulnerable parts of the performance, if there is damage to the timely replacement(the work once a week).
9 Regular inspection of dust collector filter IF filter performance, aging, should be promptly replaced(the work once every six months).
10 Electrical control cabinet and work areas, often open doors blown with compressed air inside the dust(the work on a monthly basis).
11 Regularly check the chain, sprocket, motor system lubricating, timely add lubricating oil(the work on a monthly basis).
12 Sandblasting machine work, not to prohibit personnel near. Cleaning and adjusting the operation of the site, should stop.
13 Do not use compressed air as dust.
14 Personal, equipment accidents, shall keep the site, and report to the relevant departments.